Industry

Heavy steel forcement plants.

Chimneys · ducting · structures · WHRB parts

In short

We fabricate and erect chimneys, ducting, heavy structures and boiler pressure parts for cement plants, including parts for waste-heat-recovery boilers.

  • 2012Building since
  • 118People in our team
  • IBR · ASMECodes we build to

What cement plants need

Steel that stands up to dust and heat.

Cement plants run hot, dusty and non-stop. Fabrication has to match that duty.

Hot, dusty gases

Chimneys and ducting carry abrasive, hot gases and need the right plate and supports.

Waste-heat recovery

WHRB systems need tubes, headers and coils built to IBR.

Heavy structures

Galleries, platforms and supports for large, heavy equipment.

Short kiln shutdowns

Work has to fit planned kiln stops, so fabrication is done before you shut down.

How we work

From survey to steam, one team.

The same five steps on every cement job, with your shutdown dates set at the start.

  1. At your plantSurvey & measure

    Site visit, inspection of existing equipment and the scope agreed with your team.

  2. Our officeDesign & approvals

    Drawings, calculations and IBR / code approvals before any steel is cut.

  3. Pune worksFabricate & test

    Built in our MIDC Bhosari and Chimbli works, then hydro-tested and inspected.

  4. At your plantErect & commission

    Our own crews erect, test and commission, planned around your shutdown.

  5. After handoverSupport

    Spares, inspections and repairs whenever the plant needs them.

Why Sterling

One works, one team, one contract.

Since 2012 we have built and erected boilers, pressure parts, vessels, tanks and piping for plants across India.

₹84 Cr+Listed order value across 28 major orders
118People: engineers, welders, fitters and site crews
28,500 sq ftTwo works in Pune: MIDC Bhosari and Chimbli
3Countries delivered: India, Ethiopia and Qatar

Cement enquiry

Tell us about your plant.

Share what you need and your timeline. We'll reply with a scope, schedule and budgetary offer.

Helps us quote faster

  • Plant name & capacity
  • Equipment or scope needed
  • Sizes, drawings or photos
  • Shutdown window or target date

Explore more

Products & services for cement plants.

FAQ

Cement: your questions answered.

Yes. We design, fabricate and erect self-supported MS chimneys and ducting, and have also dismantled and re-erected boiler chimneys at operating plants.

Yes. We manufacture tubes, coils, headers and panels to IBR, and we have erected a WHRB boiler with its chimneys for Century Enka.

Yes. Platforms, galleries, sheds and equipment structures are fabricated in our works and erected at site.

Yes. We fabricate at our Pune works and erect at site across India, and we have delivered projects in Ethiopia and Qatar as well.

Your plant location, the equipment or scope required, capacity and working pressure, drawings or photos if available, and your target date. Send them by email to sterlingboiler@gmail.com or call +91-968-901-1211.