Industry
Heavy steel forcement plants.
Chimneys · ducting · structures · WHRB parts
We fabricate and erect chimneys, ducting, heavy structures and boiler pressure parts for cement plants, including parts for waste-heat-recovery boilers.
- 2012Building since
- 118People in our team
- IBR · ASMECodes we build to
What cement plants need
Steel that stands up to dust and heat.
Cement plants run hot, dusty and non-stop. Fabrication has to match that duty.
Hot, dusty gases
Chimneys and ducting carry abrasive, hot gases and need the right plate and supports.
Waste-heat recovery
WHRB systems need tubes, headers and coils built to IBR.
Heavy structures
Galleries, platforms and supports for large, heavy equipment.
Short kiln shutdowns
Work has to fit planned kiln stops, so fabrication is done before you shut down.
How we work
From survey to steam, one team.
The same five steps on every cement job, with your shutdown dates set at the start.
- At your plantSurvey & measure
Site visit, inspection of existing equipment and the scope agreed with your team.
- Our officeDesign & approvals
Drawings, calculations and IBR / code approvals before any steel is cut.
- Pune worksFabricate & test
Built in our MIDC Bhosari and Chimbli works, then hydro-tested and inspected.
- At your plantErect & commission
Our own crews erect, test and commission, planned around your shutdown.
- After handoverSupport
Spares, inspections and repairs whenever the plant needs them.
For cement plants
What we supply and execute.
Heavy fabrication done in our Pune works, shipped and erected at site by our own crews.
Request a quote- Chimneys & ductingMS chimneys, flue ducting and dampers
- Structural fabricationGalleries, platforms and heavy equipment structures
- Boiler pressure partsTubes, headers and coils for WHRB boilers
- Steam & process pipingIBR steam piping, utility and process lines
- MS storage tanksWater, fuel and oil storage tanks
- Hot & cold insulationInsulation for boilers, steam lines, tanks and chilled lines
Why Sterling
One works, one team, one contract.
Since 2012 we have built and erected boilers, pressure parts, vessels, tanks and piping for plants across India.
- ISO 9001 approved
- IBR 1950 & ASME
- Own fabrication & erection crews
- See all 28 projects
Cement enquiry
Tell us about your plant.
Share what you need and your timeline. We'll reply with a scope, schedule and budgetary offer.
Helps us quote faster
- Plant name & capacity
- Equipment or scope needed
- Sizes, drawings or photos
- Shutdown window or target date
Explore more
Products & services for cement plants.
FAQ
Cement: your questions answered.
Yes. We design, fabricate and erect self-supported MS chimneys and ducting, and have also dismantled and re-erected boiler chimneys at operating plants.
Yes. We manufacture tubes, coils, headers and panels to IBR, and we have erected a WHRB boiler with its chimneys for Century Enka.
Yes. Platforms, galleries, sheds and equipment structures are fabricated in our works and erected at site.
Yes. We fabricate at our Pune works and erect at site across India, and we have delivered projects in Ethiopia and Qatar as well.
Your plant location, the equipment or scope required, capacity and working pressure, drawings or photos if available, and your target date. Send them by email to sterlingboiler@gmail.com or call +91-968-901-1211.



