Industry

Piping & tanks foroil & gas plants.

Process piping · storage tanks · vessels · chimneys

In short

We fabricate and erect process piping, storage tanks, pressure vessels and chimneys for oil & gas plants, including piping and storage tanks at the ONGC Uran LPG-II plant.

  • ₹8.1 Cr+Oil & Gas orders listed
  • 1Order delivered
  • 2012Building since

What oil & gas plants need

Code, records and safe execution.

Oil & gas sites demand certified welding, full test records and strict site safety.

Codes & records

Welding, NDT and hydro-test records for every line and vessel.

Storage tanks

Tanks for fuels and products, built and erected at site.

Site safety

Work permits and safe working inside running plants.

Pressure equipment

Vessels and receivers designed and tested to code.

How we work

From survey to steam, one team.

The same five steps on every oil & gas job, with your shutdown dates set at the start.

  1. At your plantSurvey & measure

    Site visit, inspection of existing equipment and the scope agreed with your team.

  2. Our officeDesign & approvals

    Drawings, calculations and IBR / code approvals before any steel is cut.

  3. Pune worksFabricate & test

    Built in our MIDC Bhosari and Chimbli works, then hydro-tested and inspected.

  4. At your plantErect & commission

    Our own crews erect, test and commission, planned around your shutdown.

  5. After handoverSupport

    Spares, inspections and repairs whenever the plant needs them.

Proven in oil & gas plants

Oil & gas work we’ve delivered.

ONGC, Uran PlantUran, Maharashtra
Piping & Tanks

ONGC, Uran Plant

Supply & erection of piping at the LPG-II plant; manufacture, supply & erection of storage tanks.

Approx. order value₹815 Lacs

Listed oil & gas order value: ₹815 Lacs · approx. values as published

All 28 projects

Oil & Gas enquiry

Tell us about your plant.

Share what you need and your timeline. We'll reply with a scope, schedule and budgetary offer.

Helps us quote faster

  • Plant / unit name
  • Equipment or scope needed
  • Specifications or drawings
  • Target date

Explore more

Products & services for oil & gas plants.

FAQ

Oil & Gas: your questions answered.

Yes. At ONGC’s Uran plant we supplied and erected piping at the LPG-II plant and manufactured, supplied and erected storage tanks.

Yes. Welding, testing and inspection records are provided as per the project specification.

Yes. Our site crews work under the plant’s permit-to-work system, with fabrication done in our works to reduce site hot work.

Yes. We fabricate at our Pune works and erect at site across India, and we have delivered projects in Ethiopia and Qatar as well.

Your plant location, the equipment or scope required, capacity and working pressure, drawings or photos if available, and your target date. Send them by email to sterlingboiler@gmail.com or call +91-968-901-1211.