Industry

Lower steam costs fortextile plants.

Fuel conversion · pressure parts · WHRB · chimneys

In short

We convert oil-fired boilers to briquette firing, manufacture pressure parts and erect WHRB boilers and chimneys for textile plants, for clients such as Century Denim, Birla Century and Century Enka.

  • ₹8.5 Cr+Textile orders listed
  • 3Orders delivered
  • 2012Building since

What textile plants need

Cheaper steam for every dyeing batch.

Dyeing, processing and finishing use a lot of steam. Fuel cost decides the margin.

Fuel conversion

Oil-fired boilers converted to briquette or biomass firing.

Process steam

Dyeing, stenters and finishing need steady steam.

Waste-heat recovery

WHRB boilers that turn exhaust heat into steam.

Chimneys & dust

Chimneys and multi-cyclone dust collectors for solid fuel.

How we work

From survey to steam, one team.

The same five steps on every textile job, with your shutdown dates set at the start.

  1. At your plantSurvey & measure

    Site visit, inspection of existing equipment and the scope agreed with your team.

  2. Our officeDesign & approvals

    Drawings, calculations and IBR / code approvals before any steel is cut.

  3. Pune worksFabricate & test

    Built in our MIDC Bhosari and Chimbli works, then hydro-tested and inspected.

  4. At your plantErect & commission

    Our own crews erect, test and commission, planned around your shutdown.

  5. After handoverSupport

    Spares, inspections and repairs whenever the plant needs them.

Proven in textile plants

Textile-plant work we’ve delivered.

Century DenimMadhya Pradesh
Boiler Conversion

Century Denim

Modification of 2 nos 8 TPH Thermax boilers from oil to briquette firing, with chimney, structure, MDC, economiser, furnace and grate.

Approx. order value₹450 Lacs
Birla CenturyGujarat
Boiler Conversion

Birla Century

Modification of 2 nos 14 TPH Thermax boilers from oil to briquette firing with MDC, ID/FD fans, economiser, air heater, chimney, steam piping and instrumentation.

Approx. order value₹260 Lacs
Century Enka LtdMaharashtra
Boiler Erection

Century Enka Ltd

Erection of WHRB boiler and chimneys.

Approx. order value₹145 Lacs

Listed textile order value: ₹855 Lacs · approx. values as published

All 28 projects

Textile enquiry

Tell us about your plant.

Share what you need and your timeline. We'll reply with a scope, schedule and budgetary offer.

Helps us quote faster

  • Plant name & what it produces
  • Boiler make, capacity (TPH) & pressure
  • Equipment or scope needed
  • Shutdown window or target date

FAQ

Textile: your questions answered.

Yes. We converted 2 nos 8 TPH Thermax boilers for Century Denim and 2 nos 14 TPH Thermax boilers for Birla Century from oil to briquette firing, with all the equipment.

Depending on the boiler: furnace and grate, economiser, air heater, multi-cyclone dust collector, ID / FD fans, chimney, structure, steam piping and instrumentation.

Yes. We erected a WHRB boiler and chimneys for Century Enka Ltd.

Yes. We fabricate at our Pune works and erect at site across India, and we have delivered projects in Ethiopia and Qatar as well.

Your plant location, the equipment or scope required, capacity and working pressure, drawings or photos if available, and your target date. Send them by email to sterlingboiler@gmail.com or call +91-968-901-1211.