Industry

Steam for presses inplywood plants.

Boiler house · steam headers · chimneys · insulation

In short

We build complete boiler houses, steam headers, chimneys, piping and insulation for plywood and board plants, like the turnkey project we delivered for Jolly Board Ltd.

  • ₹3.8 Cr+Plywood orders listed
  • 1Order delivered
  • 2012Building since

What plywood plants need

Steam for every daylight of the press.

Hot presses and dryers need steady steam, often from wood-waste-fired boilers.

Hot-press steam

Steady pressure for presses and veneer dryers.

Wood-waste fuel

Boilers and chimneys suited to biomass firing.

Heat distribution

Headers, piping and insulation to every press.

Production uptime

A boiler stop stops the presses, so execution must be right first time.

How we work

From survey to steam, one team.

The same five steps on every plywood job, with your shutdown dates set at the start.

  1. At your plantSurvey & measure

    Site visit, inspection of existing equipment and the scope agreed with your team.

  2. Our officeDesign & approvals

    Drawings, calculations and IBR / code approvals before any steel is cut.

  3. Pune worksFabricate & test

    Built in our MIDC Bhosari and Chimbli works, then hydro-tested and inspected.

  4. At your plantErect & commission

    Our own crews erect, test and commission, planned around your shutdown.

  5. After handoverSupport

    Spares, inspections and repairs whenever the plant needs them.

Proven in plywood plants

Plywood & board work we’ve delivered.

Jolly Board LtdIndia
Turnkey

Jolly Board Ltd

Turnkey project: complete boiler, steam distribution header, chimney, allied piping and thermal insulation.

Approx. order value₹385 Lacs

Listed plywood order value: ₹385 Lacs · approx. values as published

All 28 projects

Plywood enquiry

Tell us about your plant.

Share what you need and your timeline. We'll reply with a scope, schedule and budgetary offer.

Helps us quote faster

  • Plant name & what it produces
  • Boiler make, capacity (TPH) & pressure
  • Equipment or scope needed
  • Shutdown window or target date

Explore more

Products & services for plywood plants.

FAQ

Plywood: your questions answered.

Yes. For Jolly Board Ltd we delivered a turnkey project: complete boiler, steam distribution header, chimney, allied piping and thermal insulation.

Yes. Headers are fabricated and tested in our works and installed with the connecting piping.

Yes. We carry out fuel conversions; for example we converted Thermax boilers from oil to briquette firing for Century Denim and Birla Century.

Yes. We fabricate at our Pune works and erect at site across India, and we have delivered projects in Ethiopia and Qatar as well.

Your plant location, the equipment or scope required, capacity and working pressure, drawings or photos if available, and your target date. Send them by email to sterlingboiler@gmail.com or call +91-968-901-1211.