Industry

Built forsponge iron & steel.

WHRB parts · steam headers · chimneys · structures

In short

We build boilers, WHRB pressure parts, steam headers, chimneys and structures for sponge iron and steel plants, including a turnkey steam project for Kalyani Steels.

  • ₹2 Cr+Sponge Iron orders listed
  • 1Order delivered
  • 2012Building since

What sponge iron plants need

Recover the heat, keep the kiln running.

Kiln and furnace gases carry energy and dust. Equipment has to handle both.

Waste-heat recovery

WHRB tubes, coils and headers built to IBR for kiln exhaust gases.

Hot, dusty gases

Chimneys and ducting that handle abrasive flue gas.

Heavy structures

Platforms and supports for kilns, coolers and conveyors.

Steam distribution

Headers, piping and insulation to move steam across the plant.

How we work

From survey to steam, one team.

The same five steps on every sponge iron job, with your shutdown dates set at the start.

  1. At your plantSurvey & measure

    Site visit, inspection of existing equipment and the scope agreed with your team.

  2. Our officeDesign & approvals

    Drawings, calculations and IBR / code approvals before any steel is cut.

  3. Pune worksFabricate & test

    Built in our MIDC Bhosari and Chimbli works, then hydro-tested and inspected.

  4. At your plantErect & commission

    Our own crews erect, test and commission, planned around your shutdown.

  5. After handoverSupport

    Spares, inspections and repairs whenever the plant needs them.

Proven in sponge iron plants

Steel-plant work we’ve delivered.

Kalyani Steels LtdIndia
Turnkey

Kalyani Steels Ltd

Turnkey project: steam distribution header, boiler, allied piping and thermal insulation.

Approx. order value₹205 Lacs

Listed sponge iron order value: ₹205 Lacs · approx. values as published

All 28 projects

Sponge Iron enquiry

Tell us about your plant.

Share what you need and your timeline. We'll reply with a scope, schedule and budgetary offer.

Helps us quote faster

  • Plant name & what it produces
  • Boiler make, capacity (TPH) & pressure
  • Equipment or scope needed
  • Shutdown window or target date

Explore more

Products & services for sponge iron plants.

FAQ

Sponge Iron: your questions answered.

Yes. We manufacture tubes, coils, headers and panels to IBR for waste-heat-recovery boilers.

Yes. For Kalyani Steels we delivered a turnkey project covering the steam distribution header, boiler, allied piping and thermal insulation.

Yes. We design, fabricate and erect MS chimneys and ducting for flue gases.

Yes. We fabricate at our Pune works and erect at site across India, and we have delivered projects in Ethiopia and Qatar as well.

Your plant location, the equipment or scope required, capacity and working pressure, drawings or photos if available, and your target date. Send them by email to sterlingboiler@gmail.com or call +91-968-901-1211.